Paint Guide – Exterior
Step 01: Priming
Wall Coverage | * Please refer to paint can for instructions | ||
Actual Paint (Finishing Coat) |
![]() Nippon Paint Vinilex 5170 (Oil-based sealer) |
||
No. of Coat(s) | 2 Coats | ||
Drying time between coats | 4 hours |
Actual Paint (Finishing Coat) |
![]() Nippon Paint ExpressKote (Water-based sealer) |
||
No. of Coat(s) | 1 Coat | ||
Drying time between coats | 2 hours |
Step 02: Wall Painting
Actual Paint (Finishing Coat) |
![]() Nippon Paint |
||
No. of Coat(s) | 2 Coats | ||
Drying time between coats | 2 – 4 hours |
Actual Paint (Finishing Coat) |
![]() Nippon Paint |
||
No. of Coat(s) | 2 Coats | ||
Drying time between coats | 2 hours |
Actual Paint (Finishing Coat) |
![]() Nippon Paint |
||
No. of Coat(s) | 2 coats | ||
Drying time between coats | 2 hours |
Step 02: Roof Painting
Wall Coverage | Not Applicable | ||
Actual Paint (Finishing Coat) |
![]() Nippon Paint Roofguard |
||
No. of Coat(s) | 2 Coats | ||
Drying time between coats | 2-3 hours |
Back to DIY Guides – House Painting >